Gur Mosheiov

Faculty at The Hebrew University of Jerusalem

Schools

  • The Hebrew University of Jerusalem

Links

Biography

The Hebrew University of Jerusalem

Education

  • Ph.D. Columbia University, 1991

Publications

  • G. Mosheiov. (1992). V-Shaped policies for scheduling deteriorating jobs. Operations Research, Vol. 39, No. 6, pp. 979-991.
  • A. Federgruen and G. Mosheiov. (1993). Simultaneous optimization of system-wide measures and measures of performance balance in single machine scheduling problems; a general planning framework. Naval Research Logistics, Vol. 40, pp. 951-970.
  • G. Mosheiov. (1994). The traveling salesman problem with pick-up and delivery. European Journal of Operational Research, Vol. 79, pp. 299-310.
  • G. Mosheiov. (1994). Scheduling jobs under simple linear deterioration. Computers and Operations Research, Vol. 21, No. 6, 653-659.
  • S. Anily. and G. Mosheiov. (1994). The traveling salesman problem with delivery and backhauls. Operations Research Letters, Vol. 16, pp. 11-18.
  • G. Mosheiov. (1994). Minimizing the sum of completion times on capacitated parallel machines. Mathematical and Computer Modelling, Vol. 20, No. 6, pp. 91-99.
  • A. Federgruen and G. Mosheiov. (1994). Greedy heuristics for single-machine scheduling problems with general earliness and tardiness costs. Operations Research Letters, 16, pp. 199-208.
  • A. Federgruen and G. Mosheiov. (1997). Single machine scheduling problems with general breakdowns, earliness and tardiness costs. Operations Research, 45, pp. 66-71.
  • G. Mosheiov. (1995). Scheduling jobs with step deterioration: minimizing makespan on a single- and multi-machine. Computers and Industrial Engineering, 28, pp. 869-879.
  • G. Mosheiov. (1995). The pick-up and delivery location problem on networks. Networks, 26, pp. 243-251.
  • G. Mosheiov. (1996). On preemptive scheduling with earliness and tardiness costs. Production, Planning and Control, 7, pp. 401-406.
  • A. Federgruen and G. Mosheiov. (1996). Heuristics for multi-machine scheduling problems with earliness and tardiness costs. Management Science, 42, pp. 1544-1556.
  • A. Lann and G. Mosheiov. (1996). Single Machine Scheduling to Minimize the Number of early/tardy jobs. Computers and Operations Research, 23, pp. 769-781.
  • G. Mosheiov. (1996). Λ-shaped policies to schedule deteriorating jobs. Journal of the Operational Research Society, 47, pp. 1184-1191.
  • G. Mosheiov and A. Raveh. (1997). On trend estimation of time-series: a simple linear programming approach. Journal of the Operational Research Society, 48, pp. 90-96.
  • A. Federgruen and G. Mosheiov. (1997). Heuristics for the multi-machine minmax scheduling problem with earliness and tardiness costs. Naval Research Logistics, 44, pp. 287-299.
  • G. Mosheiov. (1998). On the solution of the "Dream-League" game. Mathematical and Computer Modelling, 27, pp. 79-83.
  • G. Mosheiov. (1998). Vehicle routing with pick-up and delivery: tour-partitioning heuristics. Computers and Industrial Engineering, 34, pp. 669-684.
  • A. Lann, G. Mosheiov and Y. Rinott. (1998). Efficient heuristics for the parallel-processing open shop. Operations Research Letters, 22, pp. 63-68.
  • G. Mosheiov. (1998). Multi-machine scheduling with linear deterioration. INFOR, 36, pp. 205-214.
  • G. Mosheiov. (2001). A common due-date assignment problem on parallel identical machines. Computers and Operations Research, 28, pp. 719-732.
  • M. Mandel and G. Mosheiov. (2001). Minimizing maximum earliness on parallel machines. Computers and Operations Research, 28, pp. 317-327.
  • G. Mosheiov. (2000). Minimizing Mean Absolute Deviation from the Mean Completion Time. Naval Research Logistics, 47, pp. 657-668.
  • G. Mosheiov and M. Shadmon. (2001). Minmax earliness-tardiness costs with unit processing time jobs. European Journal of Operational Research, 130, pp. 638-652.
  • G. Mosheiov. (2001). Scheduling problems with learning effect. European Journal of Operational Research, 132, pp. 687-693.
  • G. Mosheiov. (2001). A due-window determination in minmax scheduling problems. INFOR, 39, pp. 107-123.
  • G. Mosheiov. (2002). The complexity of job-shop scheduling with deteriorating jobs. Discrete Applied Mathematics, 117, pp. 195-209.
  • G. Mosheiov. (2001). Parallel machine scheduling with a learning effect. Journal of the Operational Research Society, 52, pp. 1-5.
  • A. Lann and G. Mosheiov. (2003). Maximum number of on-time jobs on parallel identical machines. Computers and Operations Research, 30, pp. 1745-1749.
  • G. Mosheiov and J. Sidney. (2003). Scheduling with general job-dependent learning curves. European Journal of Operational Research, 147, pp. 665-670.
  • M. Birman and G. Mosheiov. (2004). A note on a due-date assignment on a two-machine flow-shop. Computers and Operations Research, 31, pp. 473-480.
  • G. Mosheiov. (2003). Scheduling unit processing time jobs on an m-machine flow-shop. Journal of the Operational Research Society, 54, pp. 437-441.
  • G. Mosheiov and J. Sidney. (2003). New results on sequencing with rate modification. INFOR, 41, 155-163.
  • G. Mosheiov and D. Oron. (2004). A note on the SPT heuristic for solving scheduling problems with generalized due-dates. Computers and Operations Research, 31, pp. 645-655.
  • G. Mosheiov. (2004). Simultaneous minimization of total completion time and total deviation of job completion time. European Journal of Operational Research, 157, pp. 296-306.
  • G. Mosheiov and U. Yovel. (2004). Comments on: "Flow shop and open shop scheduling with a critical machine and two operations per job". European Journal of Operational Research, 157, pp. 257-261.
  • G. Mosheiov. Due-date assignment with asymmetric earliness-tardiness cost. Journal of the Operational Research Society, 54, pp. 1222-1224.
  • G. Mosheiov and D. Oron. (2005). A note on flow-shop and job-shop batch scheduling with identical processing-time jobs. European Journal of Operational Research, 161, pp. 285-291.
  • G. Mosheiov, D. Oron and Y. Ritov. (2004). Flow-shop batch scheduling to minimize total flow-time. NRL, 51, pp. 783-799.
  • G. Mosheiov. (2005). Minimizing total completion time and total deviation of job completion time from a common restrictive due-date. European Journal of Operational Research, 165, pp. 20-33.
  • G. Mosheiov and J. Sidney. (2005). A note on scheduling with learning effect to minimize the number of tardy jobs. Journal of the Operational Research Society, 56, pp. 110-112.
  • G. Mosheiov and D. Oron. (2004). Due-window assignment with unit processing time jobs. Naval Research Logistics, pp. 1005-1017.
  • G. Mosheiov. A note on scheduling deteriorating jobs. (2005). Mathematical and Computer Modelling, 41, pp. 883-886.
  • G. Mosheiov, D. Oron and Y. Ritov. (2005). Minimizing flow-time on a single machine with integer batch sizes. Operations Research Letters, 33, pp. 497-501.
  • G. Mosheiov and U. Yovel. (2006). Minimizing weighted earliness-tardiness and due-date cost with unit processing time jobs. European Journal of Operational Research, 172, pp. 528-544.
  • G. Mosheiov and D. Oron. (2007). Minmax scheduling with job-classes and earliness-tardiness costs. European Journal of Operational Research, 177, pp. 612-622.
  • G. Mosheiov and D. Oron. (2006). A Note on Batch Scheduling with Sequence-Dependent Setup Times. Information Processing Letters, 98, pp. 73-78.
  • G. Mosheiov and D. Oron. (2006). Due-date assignment and maintenance activity scheduling problem. Mathematical and Computer Modeling, 44, pp. 1053-1057.
  • G. Mosheiov and D. Oron. (2008). A single machine batch scheduling problem with bounded batch size. European Journal of Operational Research, 187, pp. 1069-1079.
  • G. Mosheiov and D. Oron. (2008). An m-machine open shop batch scheduling to minimize makespan. European Journal of Operational Research, 187, pp. 1282-1292.
  • G. Mosheiov and D. Baraz. (2008). A note on a greedy heuristic for flowshop makespan minimization with no machine idle-time. European Journal of Operational Research, 184, pp. 810-813.
  • G. Mosheiov and A. Sarig. (2007). A Due-window assignment problem with position-dependent processing times. Journal of the Operational Research Society, 57, pp. 997-1003.
  • C.-L. Li, G. Mosheiov and U. Yovel. (2008). An efficient algorithm for minimizing earliness, tardiness and due-date costs for equal-sized jobs. Coputers and Operations Research, 35, pp. 3612-3619.
  • G. Mosheiov. (2007). Minimizing total absolute deviation of job completion times: extensions to position-dependent processing times and parallel identical machines. Journal of the Operational Research Society, 59, pp. 1422-1424.
  • G. Mosheiov and A. Sarig. (2008). A Multi-criteria scheduling with due-window assignment problem. Mathematical and Computer Modeling, 48, pp. 898-907.
  • G. Mosheiov and A. Sarig. (2009). Minmax Scheduling Problems with a Common Due-Window. Computers and Operations Research, 36, pp. 1886-1892.
  • G. Mosheiov and A. Sarig. (2009). Due-date assignment on uniform machines. European Journal of Operational Research, 193, pp. 49-58.
  • A. Levin, G. Mosheiov and A. Sarig. (2009). Scheduling a maintenance activity on parallel identical machines. Naval Research Logistics, 56, pp. 33-41.
  • G. Mosheiov and A. Sarig. (2009). Scheduling a maintenance activity and due-window assignment on a single machine. Computers and Operations Research, 36, pp. 2541-2545.
  • G. Mosheiov and A. Sarig. (2009). Scheduling a maintenance activity to minimize weighted flow-time. Computers and Mathematics with Applications, 57, pp. 619-623.
  • G. Mosheiov and A. Sarig. (2009). Scheduling a maintenance activity on unrelated machines. Computers and Operations Research, 36, pp. 2759-2762.
  • G. Mosheiov and J. Sidney. (2010). Scheduling a deteriorating maintenance activity on a single machine. Journal of the Operational Research Society, 61, pp. 882-867.
  • G. Mosheiov and A. Sarig. (2010). Minimum weighted number of tardy jobs on an m-machine flow-shop with a critical machine. European Journal of Operational Research, 201, pp. 404-408.
  • G. Mosheiov and A. Sarig. (2010). Scheduling identical jobs and due-window assignment on uniform machines. European Journal of Operational Research, 201, pp. 712-719.
  • G. Mosheiov and A. Sarig. (2009). Scheduling and due-date assignment problems with job rejection. Foundations of Computing and Decision Sciences, 34, pp. 193-208.
  • L. Ben-Dati, G. Mosheiov and D. Oron. (2009). Batch scheduling on a two-machine flow-shop with machine-dependent setup times. Advances in Operations Research, doi: 10.1155/2009/153910.
  • G. Mosheiov and A. Sarig. (2011). A Note: A due-window assignment problem on parallel identical machines. Journal of the Operational Research Society, 62, pp. 238-241.
  • G. Mosheiov and A. Sarig. (2010). Scheduling with a common due-window: polynomially solvable cases. Information Sciences, 180, pp. 1492-1505.
  • G. Mosheiov, A. Sarig and J. Sidney. (2010). The Browne-Yechiali single-machine sequence is optimal for flow-shops. Computers and Operations Research, 37, pp. 1965-1967.
  • B. Mor and G. Mosheiov. (2010). Scheduling problems with two competing agents to minimize minmax and minsum earliness measures. European Journal of Operational Research, 206, pp. 540-546.
  • G. Mosheiov and D. Oron. (2010). Job dependent due-window assignment based on a common flow allowance. Foundations of Computing and Decision Sciences, 35, pp. 185-195.
  • B. Mor and G. Mosheiov. (2011). Total absolute deviation of job completion times on uniform and unrelated machines. Computers and Operations Research, 38, pp. 660-665.
  • G. Mosheiov. (2011). Proportionate flowshop with general position-dependent processing times. Information Processing Letters, 111, pp. 174-177.
  • B. Mor, G. Mosheiov and D. Oron. (2012). The equal allocation policy in openshop batch scheduling. Journal of the Operational Research Society, 63, pp. 646-652.
  • G. Mosheiov and D. Oron. (2011). Batch scheduling on a two-machine jobshop with machine-dependent setup times. Naval Research Logistics, 58, pp. 676-684.
  • B. Mor and G. Mosheiov. (2011). Single machine batch scheduling with two competing agents to minimize total flowtime. European Journal of Operational Research, 215, pp. 524-531.
  • B. Mor and G. Mosheiov. (2011). Batch scheduling on uniform machines to minimize total flow-time. Computers and Operations Research, 39, pp. 571-575.
  • G. Mosheiov. (2012). A note: multi-machine scheduling with general position-based deterioration to minimize total load. International Journal of Production Economics, 135, pp. 523-535.
  • B. Mor and G. Mosheiov. (2012). Scheduling a maintenance activity and due-window assignment based on common flow-allowance. International Journal of Production Economics, 135, pp. 222-230.
  • E. Gerstl and G. Mosheiov. (2012). Scheduling job classes on uniform machines. Computers and Operations Research, 39, pp. 1927-1932.
  • G. Mosheiov and D. Oron. (2012). Minimizing the number of tardy jobs on a proportionate flowshop with general position-dependent processing times. Computers and Operations Research, 39, pp. 1601-1604.
  • E. Gerstl and G. Mosheiov. (2012). A two-stage flowshop with a critical machine and batch availability. Foundations of Computing and Decision Sciences, 37, pp. 39-56.
  • B. Mor and G. Mosheiov. (2012). Minmax scheduling problems with common flow-allowance. Journal of the Operational Research Society, 63, pp. 1284-1293.
  • B. Mor and G. Mosheiov. (2012). Heuristics for scheduling problems with unavailability constraints and position-dependent processing times. Computers and Industrial Engineering, 62, pp. 908-916.
  • B. Mor and G. Mosheiov. (2012). Parallel machine scheduling problems with common flow allowance. International Journal of Production Economics, 139, pp. 623-633.
  • E. Gerstl and G. Mosheiov. (2013). Scheduling problems with two competing agents to minimize weighted earliness-tardiness. Computers and Operations Research, 40, pp. 109-116.
  • B. Mor and G. Mosheiov. (2012). Batch scheduling of identical jobs on parallel identical machines. Information Processing Letters, 112, pp. 762-766.
  • G. Mosheiov and D. Shabtay. (2013). Maximizing the weighted number of Just-In-Time jobs on a single machine with position-dependent processing times. Journal of Scheduling. 16, pp. 519-527.
  • E. Gerstl and G. Mosheiov. (2012). Scheduling on parallel identical machines with job rejection and position-dependent processing times. Information Processing Letters, 112, pp. 743-747.
  • B. Mor and G. Mosheiov. (2012). Batch scheduling with step-deteriorating processing times to minimize flowtime. Naval Research Logistics, 59, pp. 587-600.
  • E. Gerstl and G. Mosheiov. (2013). Due-window assignment with identical jobs on parallel uniform machines. European Journal of Operational Research, 229, pp. 41-47.
  • E. Gerstl and G. Mosheiov. (2013). Due-window assignment problems with unit time jobs. Applied Mathematics and Computation. 220, pp. 487-495.
  • B. Mor and G. Mosheiov. (2014). Polynomial time solutions for scheduling problems on a proportionate flowshop with two competing agents. Journal of the Operational Research Society, 65, pp. 151-157. (Was chosen by the editorial board of JORS as one of the "10 influential articles" of the journal, 2013)
  • B. Mor, G. Mosheiov and D. Shabtay. (2013). A Note: Minmax due-date assignment problem with lead-time cost. Computers and Operations Research, 40, pp. 2161-2164.
  • E. Gerstl and G. Mosheiov. (2013). An improved algorithm for due-window assignment on parallel identical machines with unit-time jobs. Information Processing Letters, 113, pp. 754-759.
  • E. Gerstl and G. Mosheiov. (2014). The optimal number of used machines in a two-stage flexible flow shop scheduling problem. Journal of Scheduling, 17, pp. 199-210.
  • E. Gerstl and G. Mosheiov. (2013). A two-stage flow shop batch scheduling problem with the option of using Not-All-Machines. Internationl Journal of Production Economics. 146, pp. 161-166.
  • B. Mor and G. Mosheiov. (2014). Batch scheduling of identical jobs with controllable processing times. Computers and Operations Research, 41, pp. 115-124.
  • E. Gerstl, G. Mosheiov and A. Sarig. (2014). Batch scheduling in a two stage flexible flowshop problem. Foundations of Computing and Decision Sciences, 39, pp. 3-16.
  • E. Gerstl and G. Mosheiov. (2013). Minmax due-date assignment with a time window for acceptable lead-times. Annals of Operations Research, 211, pp. 167-177.
  • E. Gerstl and G. Mosheiov. (2014). Single machine Just-in-Time scheduling problems with two competing agents. Naval Research Logistics, 61, pp. 1-16.
  • B. Mor and G. Mosheiov. (2014). Batch scheduling with a rate-modifying maintenance activity to minimize total flowtime. International Journal of Production Economics, 153, 238-242.
  • E. Gerstl and G. Mosheiov. (2014). A two-stage flexible flowshop problem with unit-execution-time jobs and batching. International Journal of Production Economics, 158, pp. 171-178.
  • E. Gerstl, B. Mor and G. Mosheiov. (2015). A note: maximizing the weighted number of Just-In-Time jobs on a proportionate flowshop. Information Processing Letters, 115, 159-162.
  • B. Mor and G. Mosheiov. (2015). A note: minimizing maximum earliness on a propotrionate flowshop. Information Processing Letters, 115, 253-255.
  • B. Mor and G. Mosheiov. (2015). Minimizing the number of early jobs on a proportionate flowshop. Journal of the Operational Research Society, 66, 1426-1429.
  • B. Mor and G. Mosheiov. (2015). Scheduling a deteriorating maintenance activity and due-window assignment. Computers and Operations Research, 57, 33-40.
  • Y. Ben-Yehoshua, E. Hariri and G. Mosheiov. (2015). A note on minimising total absolute deviation of job completion times on a two-machine no-wait proportionate flowshop. International Journal of Production Research, 53, 5717-5724.
  • E. Gerstl and G. Mosheiov. (2015). Scheduling with a due-window for acceptable lead-times. Journal of the Operational Research Society, 66, 1578-1588.
  • Y. Ben-Yehoshua and G. Mosheiov. (2016). A single machine scheduling problem to minimize total early work. Computers and Operations Research, 73, 115-118.
  • B. Mor and G. Mosheiov. (2016). Minsum and minmax scheduling on a proportionate flowshop with common flow allowance. European Journal of Operational Research, 254, 360-370.
  • B. Mor and G. Mosheiov. (2016). Minimizing maximum cost on a single machine with two competing agents and job rejection. Journal of the Operational Research Society, 67, 1524-1531.
  • B. Mor and G. Mosheiov. (2017). A two-agent single machine scheduling problem with due-window assignment and common flow allowance. Journal of Combinatorial Optimization, 33, 1454-1468.
  • E. Gerstl and G. Mosheiov. (2017). Single machine scheduling problems with generalized due-dates and job-rejection. International Journal of Production Research, 55, 3164-3172.
  • A. Agnetis and G. Mosheiov. (2017). Scheduling with job-rejection and position-dependent processing times on proportionate flowshops. Optimization Letters, 11, 885-892.
  • E. Gerstl, B. Mor and G. Mosheiov. (2017). Scheduling with two competing agents to minimize total weighted earliness. Annals of Operations Research, 253, 227-245.
  • E. Gerstl, B. Mor and G. Mosheiov. (2017). Minmax scheduling with acceptable lead-times: extensions to position-dependent processing times, due-window and job rejection. Computers and Operations Research, 83, 150-156.
  • E. Gerstl and G. Mosheiov. (2017). Minmax weighted earliness-tardiness with identical processing times and two competing agents. Computers and Industrial Engineering, 107, 171-177.
  • G. Mosheiov and V. Strusevich. (2017). Determining optimal sizes of bounded batches with rejection via quadratic min-cost flow. Naval Research Logistics, 64, 217-224.
  • S. Fiscman and G. Mosheiov. (2018). minimizing total load on a proportionate flowshop with position-dependent processing times and job rejection. ­ 132, 39-43.
  • B. Mor and G. Mosheiov. (2018). A Note: Minimizing Total Absolute Deviation of job Completion times on unrelated machines with general position-dependent processing times and job-rejection. To appear in Annals of Operations Research.

Honors And Awards

Research and Teaching Awards

  • Received the Rector's Prize of The Hebrew University of 2003 for "excellent researcher".
  • Received the Rector's (Milken) Prize of The Hebrew University of 2015 for "long standing excellence in teaching".

Read about executive education

Other experts

Looking for an expert?

Contact us and we'll find the best option for you.

Something went wrong. We're trying to fix this error.